Chennai Metro Rail Limited has successfully completed the 500-meter-long elevated viaduct project from Parangimalai to Adambakkam. Chennai Metro Rail officials stated that this project was very challenging and time-consuming due to space constraints, as it was constructed on the second level, above the existing elevated railway line.