The B28 bullet train is currently being manufactured in Bengaluru. This train is scheduled to operate along the 508-kilometer route between Mumbai and Ahmedabad. In the initial phase, the bullet train will run over a distance of 97 kilometers between Surat and Vapi. If this very train were to operate between Chennai and Madurai, the journey could be completed in just two hours. Let us take a look